Setting out Eaves
The process for Setting out Eaves includes, marking and cutting Rafter Tails to line and Eave width, installing Fascia and Barge to suit the Eave Drop Off, installing Eave Bearers to required spacing, and installing the Eave Soffit Lining material and Storm Mould.
Setting out Eaves and Cutting Rafters to Line
The Following video's show how to mark and cut Rafters for Eaves
Gable Roof
Hip Roof
Proudly powered by Weebly